Welcome to visit our website

深圳市博恒人居环境有限公司

CASESProject Case

Taiyuan Metro Line 1- Purge Room Components

发布日期:2024-06-21 Number of views:1

The Phase I project of Taiyuan Metro Line 1 is an inverted L-shaped urban backbone line from northwest to southeast, with a total length of 28.737 kilometers and 24 underground stations. On September 15, 2021, the first shield tunneling machine "Jinlong No.1" started from the right line of the section from Dongtaibao Station to Nanneihuan Dongjie Station. As of November 24, 2023, with an interval of 800 days, the entire line has achieved "tunnel connection". Taiyuan Metro Line 1 is a new generation urban rail transit system that utilizes a series of high-tech technologies such as modern computers, communication, control, and system integration to achieve full automation of train operation.

微信截图_20240621104957.png

For this project, NCC Boheng is fully responsible for Taiyuan Metro Line 1 The work content of the blowing and sweeping room components adopts a self contracting and material packaging method. The specifications, quantity, and quality requirements of the materials are based on the drawings of Party A, and the quality direction is accurately controlled to ensure the perfect progress of the process.


What do you think of this article?

0 0
Netizen comments

administrators

No comment on this content

湖南省长沙市net friend
online customer service
Telphone Number

Telphone Number

0755-89687979

Wechat consulting
深圳市博恒人居环境有限公司
Back to top
X深圳市博恒人居环境有限公司

截屏,微信识别二维码

微信号:Wx88888888

(点击微信号复制,添加好友)

打开微信

微信号已复制,请打开微信添加咨询详情!